Figener carries out the executive project for the interconnection of a 200 t/h Biomass boiler.
Description: executive project for the connection of a 200 t / h biomass (wood chip) HPB boiler with the alumina refinery, including steam, condensate, replacement water, cooling water and compressed air piping design. Includes the design of a new fire system.
Main challenges:
- Interconnection made in an old factory unit;
- Maximum use of existing Pipe Racks, being necessary to carry out their structural verification;
- Condensate and steam lines (16 ″) with approximately 500 m;
The following video shows an excerpt of the blowing performed in the Caldeira, in February 2020.